久久亚洲国产综合网_级毛片无码免费真人_免费啊v在线观看_欧美日韩一区二区三区看片_欧美牲交A欧美牲交AⅤ一_制服十八禁第一页_女同免费毛片在线播放高清_黄色视频在线观看_边做边爱完整版免费视频在线播放_網友分享国产精品66福利心得

ASTRAZENECA CHINA SHANGHAI PHASE III PROJECT

Construction time:2015-2017 Location:pudong shanghai

AstraZeneca’s current China head office is located on a 26,767 m2 site within Shanghai’s ZhangJiang Hi-Tech Park. Phased construction on the site was started in 2008 with Phase I and II being completed in 2012. Phase I is a commercial office building with associated underground parking, fitness centre and cafeteria while Phase II is a R&D centre with laboratories. Now Phase III will be separate office building.The site is in the area of LiangJing Road, Zhang Jiang Hi Tech Park, Pudong New District, Shanghai.There will be a separate office building in Phase III. The estimated total gross floor areas are approximately 16,000 M2 above ground and 12,000 M2 underground. The site to be developed will have a building footprint of no more than 2,450 M2. The car parking area will be 2 level and with Civil Defense design.

Related news:
Last one:
Next article: